![]() The Space Based Infrared System (SBIRS) cost engineering model (CEM) described in this paper is an end-to-end process integrating engineering and cost expertise through commonly available spreadsheet software, allowing for concurrent design engineering and cost estimation to identify and balance system drives to reduce acquisition costs. Early decisions made during the concept exploration and development (CE&D) phase will drive the cost of a program more than any other phase of development thus, designers must be able to assess both the performance and cost impacts of their early choices. S.Ĭurrent architectural and design trade techniques often carry unaffordable alternatives late into the decision process. Cost-engineering modeling to support rapid concept development of an advanced infrared satellite systemīell, Kevin D. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |